The company YAROVIT Energo is the biggest supplier of power-generating equipment manufactured in Russia and countries of the CIS.

One of the main directions of the company activities is introducing modern and highly efficient cogeneration, boiler and electrical equipment to enterprises of the energy-generation sector.

Our company conducts continuous marketing research, that of the need of the energy system and enterprises of various industrial branches in power equipment.

The company YAROVIT Energo takes part in implementing such large-scale projects as:

· upgrading of power-generating units at the Lukoml GRES (State-Owned Regional Electric Station), Republic of Belarus. In 2003 modernization of energy unit No 3 was completed, resultant in the unit stepped-up efficiency, its service life extension by 20 years and a 7,5 MW power increase. In 2005 a contract was signed to produce upgrade kits to refurbish three type K-300-240 turbines for units Nos 1, 2, 4, which will result in the service life extension by 20 years and a power increase of 47.4 MW.

· retrofitting of 2 energy-generating units at Berioza GRES (Belarus) whereby each unit is outfitted with two additional 25-MW (PGU-215) gas turbines manufactured by the company “NPKG “Zoria-MashProekt”. In 2003 reconstruction of energy-generating unit No 4 was completed, which resulted in lower consumption of conventional fuel for energy generation and step up the unit power output by 50 MW. In 2005 it is planned to finish retrofitting energy-generating unit No 3 in the same way.

· reconstruction of Mary GRES (Turkmenistan). The contracts are to retrofit the setting of one of the eight turbines of Mary GRES. The project stipulates for stepping up the unit efficiency by 34 to 38 percent. The power output increment following the modernization of eight units will amount to 115 MW.

· Abadan GES (Turkmenistan) modernization, whereby the gas turbines will be supplemented with a steam turbine which will result in bringing the cogeneration plant power output to 370 MW. The OJSC “YAROVIT Energo” has prepared a technical proposal to expand the Abadan GES (gas electric station) developing it into a cogeneration electric power station.

· delivering a type PT-35/40-8,8 turbine produced by LMZ (Leningrad Metal Works) to Vitebsk TES (thermal electric station), Belarus.

The company YAROVIT Energo participates at all times in supplying the equipment manufactured by its partner factories.

· delivery of a steam-turbine unit, type R-12-3,4/0,1 manufactured by “Kaluga Turbine Works” (OJSC “KZT”), to Lida TES (Belarus).

· delivery of a steam-turbine unit, type PR-6-3,4/0,5/0,1 manufactured by OJSC “KZT” to the Belarusian Unitary Enterprise “PO “BelarusKaliy” (Belarus).

· delivery of a single-unit turbogenerator, type TG-1,5A/10,5 P13/3 manufactured by OJSC “KZT” to OJSC “MozyrSol” (Belarus).

· delivery of a steam-turbine unit, type R-6-3,4/0,5-1 manufactured by OJSC “KZT” to Gomel municipal heating system (Belarus).

· delivery of a steam turbine, type P6-3,4/0,5-1 manufactured by OJSC “KZT” to OJSC “Gomel Chemical Works” (Belarus).

· delivery of a steam boiler, type DE-25-24-380 GMO, manufactured by OJSC “Biysk Boiler Works” to Pinsk municipal heating system (Belarus).

· delivery of a steam boiler, type DE-25-20-250 GMO, manufactured by OJSC “Biysk Boiler Works” to Mozyr Oil Refinery (Belarus).

The company YAROVIT Energo plans to take part in a number of projects, including:

· Republic of Belarus— reconstruction of TES-3 and TES-2 of Minsk, Lida TES, TES-2 of Grodno, supplying the equipment for type PGU-450 cogeneration unit at TES-5 of Minsk.

· Tajikistan – upgrading and the hydroelectric generators at Nurek GES, jointly with “Elektrosila” Works.
 
For questions, address: energo@yarovit.com